|
 |
|
Information on Brcko District
|
| 28/8/2001 |
 |
 |
 |
   |
| |
|
Brčko sits at the crossroads of Bosnia and Herzegovina where
the narrowest portion of Republika Srpska meets the Federation. The Posavina
Corridor in Republika Srpska, only five kilometers wide at Brčko, connects the
eastern and western parts of Republika Srpska and provides the easiest
north-south access for the Federation across the Sava river to the rest of
Europe. Traditionally the trade, industry and transport hub of the region, Brčko
borders Croatia on the Sava and is within three hours of Zagreb an d ninety minutes from Belgrade via Croatia.
| 1991 Census |
|
Brcko Municipality |
| Bosniac 44% |
| Croat 25% |
| Serb 21% |
| Other 10% |
| Brcko Grad (town) |
| Bosniac 56% |
| Croat 7% |
| Serb 20% |
|
Other 17.5% |
As a result of the war, the municipality has been split between the
Federation and the RS and the town itself, situated north of the Inter Entity
Boundary Line (IEBL), is 97,5% Serb, approximately 75% of whom are displaced
persons from the Federation and refugees from Croatia.
At the Dayton Peace Talks in November 1995, the parties were unable to agree
on control of Br čko. The dispute was
put to international arbitration in Annex II of the Dayton Peace Accords. On 14
February 1997, the Presiding Arbitrator of the Brčko Tribunal, Mr. Roberts Owen
(U.S.) issued a decision placing the RS portion of the Brčko municipality
under international supervision. The Arbitral Tribunal
further extended the supervision period, on 15 March 1998, for a year. The Final
Award was issued on 5 March 1999.
The Final Award creates a Special District for the entire pre-war Opstina
whose territory belongs to both Entities, Republika Srpska and the Federation.
An Annex to the Final Award, issued by the Arbitral Tribunal on 18 August 1999,
deals with issues such as the structure of the District Government, the judicial
and penal system, the police, education, taxation and others.
There is still much to be done. The
Supervisor has asked a great deal from all sides and has received significant
compliance on a number of issues. The main challenge in front of us is the
implementation of the arbitration Final Award. But implementation remains
costly. The Supervisor still needs the support of the international community to
demonstrate to the parties that there are significant material benefits to
compliance with the Arbitral decision and with the Dayton Peace
Accords.
|
|